New Door Install - Morag Bell Building (009) - 19 November 2024 - 1 day

Posted: 12 November 2024

Description of the Works

The single door at the end of Morag Bell Building, which is the entry and exit point to the old 'F' (Chemistry) Building car park is in poor condition.  A new aluminium door will be installed to replace this.  The works will start approximately 8.30 - 9.00 a.m., there will be no entrance or exit allowed through this area whilst the new door is being fitted, and the area will be taped off.  Other entry doors are available nearby.  The door is, however, a fire escape, and can still be used as an emergency exit should the need arise.  The window above the door will be replaced at a later date with scaffold installed.

Timescale

The works are starting on Tuesday 19 November and should be completed within the day.

How can I get more information and help?

The Estates and Facilities Management team member looking after the task is detailed below and can be contacted about any difficulties experienced because of these works.

Steve Leatherby - Building Fabric Team Leader

Mobile:  07854166709

Email:  s.r.leatherby@lboro.ac.uk